The purpose of this recommended practice is to provide the Contractor with a specification that harmonizes the requirements of major process industry companies and engineering/construction firms into a single document.

This specification describes the requirements for furnishing, transporting, handling and installing driven load bearing piles, conforming to the load capacities specified in the contract documents. Pile load tests and dynamic monitoring tests are included, if within the contract scope of work.

Pile types covered in this specification are:

Steel pipe piles
Concrete filled thin shell piles
Steel “H” piles
Step taper piles
Prestressed concrete piles
Timber piles

Any conflicts or inconsistencies between this specification, the design drawings, or other contract documents shall be brought to the attention of the Buyer for resolution.

Product Details

Published:
06/01/2001
File Size:
1 file , 80 KB

PIP STS02360

September 11, 2020 by No Comments

Click here to purchase
This Practice describes the requirements for supplying, transporting, handling, installing, and testing driven load-bearing piles. Pile types covered in this Practice are as follows:

a. Steel pipe piles

b. Concrete-filled thin shell piles

c. Steel H-piles

d. Step taper piles

e. Prestressed/precast concrete piles

f. Timber piles

Product Details

Edition:
3rd
Published:
09/01/2008
Number of Pages:
26
File Size:
1 file , 120 KB

PIP STS02360

September 11, 2020 by No Comments

Click here to purchase
This Practice describes the requirements for supplying, transporting, handling, installing, and testing driven load-bearing piles. Pile types covered in this Practice are as follows:

a. Steel pipe piles

b. Concrete-filled thin shell piles

c. Steel H-piles

d. Step taper piles

e. Prestressed/precast concrete piles

f. Timber piles

Product Details

Published:
01/01/2017
Number of Pages:
25
File Size:
1 file , 740 KB