PIP ARS13120

September 11, 2020 by No Comments

Click here to purchase
This Practice provides pre-engineered metal building contractors and manufacturers with a specification for pre-engineered buildings. It describes the requirements for design, fabrication, and erection of pre-engineered metal buildings. This Practice does not address foundation requirements, interior finish out, cranes, specialty requirements, or building systems such as fire protection, electrical, or mechanical systems.

Any conflicts or inconsistencies between this Practice and other contract documents shall be brought to the attention of the buyer for resolution.

Product Details

Published:
06/01/2007
File Size:
1 file , 100 KB

PIP ARS13120

September 11, 2020 by No Comments

Click here to purchase
This Practice provides requirements for design, materials, fabrication, and erection of pre-engineered metal buildings, including exterior doors, windows, louvers and ventilators. This Practice does not include buildings to be designed for blast loads.

Product Details

Published:
01/01/2020
Number of Pages:
29
File Size:
1 file , 250 KB

PIP ARS13120

September 11, 2020 by No Comments

Click here to purchase
This Practice provides requirements for pre-engineered metal buildings.

This Practice describes the requirements for design, materials, fabrication, and erection of pre-engineered metal buildings, including exterior doors, windows, louvers and ventilators.

Product Details

Published:
04/01/2014
Number of Pages:
30
File Size:
1 file , 360 KB

PIP ARS13120

September 11, 2020 by No Comments

Click here to purchase
This Practice provides pre-engineered metal building contractors and manufacturers with a specification for pre-engineered buildings. It describes the requirements for design, fabrication, and erection of pre-engineered metal buildings. This Practice does not address foundation requirements, interior finish out, cranes, specialty requirements, or building systems such as fire protection, electrical, or mechanical systems.

Any conflicts or inconsistencies between this Practice and other contract documents shall be brought to the attention of the buyer for resolution.

Product Details

Published:
10/01/2001
File Size:
1 file , 82 KB